Project Achievements
Overview of equipment and engineering achievements
Da Ben Ying Co. Ltd.’s engineering achievements are divided into three categories based on the type of equipment: sludge dehydration, sewage aeration and ventilation engineering. Each case is explained in detail, including the industry, the original problem, the equipment specifications, the installation time, and the quantifiable treatment results, rather than just including photos and the client’s name.

Case classification and screening
Case of sludge dehydration

HS500, HS800, multiple pools in one machine
When comparing the HS500 with the HS800, first consider the sludge characteristics, the required treatment volume, and operating conditions. When evaluating multiple tanks in one unit, it is necessary to confirm the pool configuration, the sludge transport route, and the switching method for each tank.
Sewage aeration case

KTY888ST, aerated balloons
When evaluating KTY888ST or aerated balloons, it is necessary to understand the pond conditions, existing aeration configuration, oxygenation or mixing requirements, and confirm that there is sufficient space for maintenance.
Ventilation engineering case

Inter-building pipes, factory ventilation
The building’s ductwork emphasizes shared exhaust routes, supplementary ventilation, and recirculation; the factory’s ventilation system is based on the ventilation requirements of the work areas and examines airflow routes and duct configurations.
Problems before processing and reasons for selection
Each case starts with the actual problems encountered by the customer—whether it’s insufficient sludge treatment efficiency, outdated aeration system failure, or poor ventilation affecting the working environment. The case content will explain how Da Ben Ying Co. Ltd. can identify the root cause through on-site inspections and original water tests, and provide recommended equipment selection recommendations accordingly.
Installation and test drive process
The test drive phase after the equipment installation is a crucial part of verifying whether the actual operational results meet expectations. In this case, adjustments made during the test drive process and the initial conditions during the official operation will be recorded as much as possible.
Quantifiable results and observation period
When presenting the results of the case study, Da Ben Ying Co. Ltd. will try to provide specific measurement data (processing volume, water quality improvement data, and changes in electricity usage) along with corresponding observation periods, avoiding vague and general descriptors to allow readers to independently assess the data’s value and applicability.
Customer name and photo permission
The client names, factory photos, and specific data involved in the case must be obtained with the client’s formal permission before being disclosed. If the client is uncomfortable with disclosing their full name, they will be anonymized by industry and region to ensure the case remains authentic and respects their business confidentiality.
Want to see experiences that are similar to your own case?
Browse the corresponding category cases:First, confirm whether the demand is for sludge dehydration, sewage aeration or ventilation engineering; then compare whether the existing equipment, space, and operating conditions are similar.
Asking for on-site evaluation via LINE:You can first organize the existing equipment, site layout, and any issues you want to improve as preliminary discussion materials.