A single unit multi-pool sludge dehydration system replaces the conventional pond-by-pond configuration with a single onshore mud pump paired with a pipeline switch.

One machine for multiple sludge recirculation and dehydration systems

The multi-tank sludge dehydration system is a patented piping design from Da Ben Ying Co. Ltd.. It replaces the traditional method of installing one submersible pump per sludge tank and manually moving it with a single onshore mud pump by combining a single onshore mud pump with a piping switch. This effectively reduces the workload and operational risks for operators.

The risks of manually moving a traditional submersible pump to a new location

Traditional multi-tank sludge treatment typically involves placing one submersible pump in each tank; once one tank is full, the submersible pump has to be pulled out of the deep water and moved to the next tank to continue the process. This process not only consumes manpower and time, but the submersible pump itself is not lightweight; in addition, the wet environment around the tank, the varying depths, and the slippery surface make it somewhat risky for older or less experienced operators to operate; this is especially true when working at night or in the rain.

Da Ben Ying Co. Ltd. Roller-type Sludge Dewatering Machine (Real-life Appearance Reference)

Multiple pools in one unit, proprietary working method for the main base, saves time and labor, more in line with the pig farming industry

The entire machine is made in Taiwan; no spare parts are left behind!

  • ▶
    Government-subsidized patent-model livestock farming equipment comes with a two-year warranty extension
  • ▶
    Eliminate the hassle and cost of collecting sewage sludge from your wastewater pond every year
  • ▶
    Simplifying sludge dehydration makes environmental inspections unnecessary!

Multi-tank design allows for independent extraction of sludge from the aeration, deaeration, and final settling tanks.

How to switch between multiple pools with one land-based pump

The one-machine multi-pool system of Da Ben Ying Co. Ltd. has been changed toSingle land-based mud pumpReplacing the pond-specific sedimentation pumps with a patented piping and valve design that centralizes the sludge piping for multiple ponds to the onshore control terminal. Operators simply switch the corresponding valves or control panel on land to determine which pond’s sludge to pump, eliminating the need to personally descend to the water’s edge to move the sedimentation pumps. This greatly improves operational convenience and significantly reduces the risk of personnel wading into the water or working at heights.

Which pools can be included and how to arrange the operations?

The system can, based on the needs of the site, incorporate sludge tanks of different properties such as original tank, anaerobic tank, aeration tank, and final settling tank into the same pumping system according to the processing process sequence. The operation personnel can determine the pumping sequence and frequency of each tank based on the daily sludge accumulation status; the extracted sludge can be directly sent to HS500 或 HS800 Dehydration treatment forms a complete working chain from recirculation to reduction.

Pipeline, valve parts, reverse flushing and anti-blocking design

The piping and valve components are crucial factors in determining the stability of the pumping effect. Da Ben Ying Co. Ltd. incorporated counter-washing mechanisms and anti-blocking measures into the piping design, relying on regular counter-washing to reduce the likelihood of sediment accumulation and blockage within the pipeline. It is worth noting here that the risk of blockage is influenced by the viscosity of the sediment, the solid content, the impurities, and the length and elevation of the pipeline. “Reducing the blockage risk through counter-washing and piping design” is a more accurate description of the actual usage conditions; actual maintenance frequency is still recommended to be adjusted based on the actual operating conditions.

Assessment of site elevation, distance, and sludge properties

The piping distance and lift height of a multi-tank system are influenced by the site topography, the relative position of the pond body, and the nature of the sludge. This is also one of the reasons why Da Ben Ying Co. Ltd. insists on arranging a site survey before providing a quote. The technician will actually measure the distance and elevation difference between each tank, assess whether the sludge density is suitable for the existing pump specifications, and then propose a corresponding piping planning recommendation.

The complete process with the HS500/HS800

The multi-tank system is responsible for the "transfer and concentration" of sludge. The actual dehydration and reduction of volume still needs to be completed by the dehydration machine. The common combination is to have the sludge from multiple tanks pumped alternately into the concentration tank according to a schedule, or directly into the inlet end of the dehydration machine. HS500 或 HS800 It involves dehydration, forming a complete process from sludge extraction and concentration to dehydration. It is particularly suitable for livestock farms with a large number of sludge ponds and industrial wastewater treatment systems.

Field inspection, testing, and installation conditions

The nature and volume of sludge in large-scale construction sites vary significantly, so Da Ben Ying Co. Ltd. recommends arranging a site survey first to take samples for raw water testing, after confirming the dehydration effect and the required dosage conditions, a formal equipment specification and piping configuration proposal will then be submitted, while simultaneously confirming that the site space, power supply, and the flow path for temporary storage of the mud cake meet the installation requirements.

Common Questions (FAQ)

Is the HS800 really twice as powerful as the HS500?

Actual processing capacity is affected by the original sludge concentration, solid content ratio, and dosage conditions. It is recommended to use the results of the original water test and the numerical values in the official standard book as a reference.

What kind of case is best suited to use the HS800 directly, rather than using two HS500 units?

The choice of configuration depends on a comprehensive evaluation of the site space, power supply conditions, manpower allocation, and subsequent maintenance requirements. Each configuration has its advantages and disadvantages; it is recommended to discuss the choice with the business window before making a decision.

Can the HS800 be used with a multi-pool system?

Yes. For large-scale cases with a large number of sludge ponds, it can be combined withOne machine for multiple sludge dehydration systemsThe sludge is collected and then sent to a centralized treatment facility. HS800 Unified handling.

Are paper mills and large livestock farms suitable for HS800?

The amount of sludge in these types of industries is usually higher, so it is recommended to refer to the following:Treatment of paper mill wastewater或Livestock wastewater treatmentPage, and apply for original water testing to confirm actual suitability.